paula4sheff Posted March 13, 2018 Share Posted March 13, 2018 Any repairs have to be done at Amy's cost throughout the contract period Hence why it never gets done..... Link to comment Share on other sites More sharing options...
niallzi Posted March 13, 2018 Share Posted March 13, 2018 Have they closed any of the roads yet round there? There's the signs up but dosen't say which roads! St aidan's is pretty bad No work has started as of yet no...I'm wondering when it will start too! Link to comment Share on other sites More sharing options...
jack reacher Posted March 13, 2018 Share Posted March 13, 2018 When was London Rd/ Chesterfield Rd last re-surfaced, any ideas ? Link to comment Share on other sites More sharing options...
choogling Posted March 13, 2018 Share Posted March 13, 2018 most of the pavements in Stockbridge have damage caused by the recent bad weather frost causing the surface to lift and crack many roads now have potholes ,very poor job they even laid them in the rain. Link to comment Share on other sites More sharing options...
hackey lad Posted March 13, 2018 Share Posted March 13, 2018 Any repairs have to be done at Amy's cost throughout the contract period Then why are Amey not ensuring the job is done correctly in the first place ? Link to comment Share on other sites More sharing options...
ECCOnoob Posted March 13, 2018 Share Posted March 13, 2018 most of the pavements in Stockbridge have damage caused by the recent bad weather frost causing the surface to lift and crack many roads now have potholes ,very poor job they even laid them in the rain. Lets be honest, if they didn't lay them in the rain people would be on here bitching and moaning about how work is not being done, how there have been road closures without any workmen, how there has been all these delays, how they have failed to complete the work on time.... etc .... etc... They cant seem to do right for doing wrong. Link to comment Share on other sites More sharing options...
carosio Posted March 13, 2018 Share Posted March 13, 2018 This morning saw contactors (not Amey I think)) making extensive repairs to road surface on Wordsworth Avenue near Asda. Not just filling in holes but rolling lengthy patches of tarmac where it has eroded away. The whole road has now been planed (at long last), along with all the extensive patches only laid two weeks ago! Link to comment Share on other sites More sharing options...
Guest makapaka Posted March 13, 2018 Share Posted March 13, 2018 Then why are Amey not ensuring the job is done correctly in the first place ? They should do - but you will always have issues arising. Our road is perfect - but I don’t believe that suggests every other road they have resurfaced is. For that same reason we shouldn’t assume the opposite where some roads have problems. As the other poster said - the repairs are done at their cost so hopefully they will want to limit any poor workmanship. Link to comment Share on other sites More sharing options...
Cyclone Posted March 13, 2018 Share Posted March 13, 2018 You think your road is perfect, give it a little time, if not this winter, then the next. Link to comment Share on other sites More sharing options...
Guest makapaka Posted March 13, 2018 Share Posted March 13, 2018 You think your road is perfect, give it a little time, if not this winter, then the next. Ok well maybe. We’ve had two winters so far and no issues. Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now