BigPP Posted September 3 Share Posted September 3 1 hour ago, Cody's Granddad said: What happened to the tunnel that was supposed to start at Flouch This is yet another example of a Tory plan that was quietly dumped. https://www.theguardian.com/uk-news/2016/mar/15/george-osborne-budget-to-set-transport-schemes-in-motion 'George Osborne will use Wednesday’s budget to set in motion plans for a high-speed railway line from Manchester to Leeds and an 18-mile underground road tunnel beneath the Peak District.' Link to comment Share on other sites More sharing options...
Popular Post HeHasRisen Posted September 3 Popular Post Share Posted September 3 18 mile tunnel under the Peaks. Behave. More chance of Lord Lucan being spotted riding the Loch Ness Monster. 6 Link to comment Share on other sites More sharing options...
TOM PEPPER Posted September 3 Share Posted September 3 11 minutes ago, HeHasRisen said: 18 mile tunnel under the Peaks. Behave. More chance of Lord Lucan being spotted riding the Loch Ness Monster. Thought it was Shergar. 1 Link to comment Share on other sites More sharing options...
Thorpist Posted September 3 Share Posted September 3 Over many years cross pennine routes have been discussed and planned proposals put forward usally just before major infrastructure improvements are announced in London, usually the extensive preparation work fades away . Is a crossrail 2 about to be announced ? The links between the Norths major cities are pathetic . 1 Link to comment Share on other sites More sharing options...
Delbow Posted September 4 Share Posted September 4 10 hours ago, Thorpist said: Over many years cross pennine routes have been discussed and planned proposals put forward usally just before major infrastructure improvements are announced in London, usually the extensive preparation work fades away . Is a crossrail 2 about to be announced ? The links between the Norths major cities are pathetic . The money for the bypass would be better spent improving rail links to make them faster and more reliable. Lots and lots of people are deterred from driving over the Pennines to Manchester because of the congestion, so when congestion is reduced they will be tempted back on to the roads and the congestion will eventually return. Link to comment Share on other sites More sharing options...
SheffieldForum Posted September 4 Author Share Posted September 4 39 minutes ago, Delbow said: The money for the bypass would be better spent improving rail links to make them faster and more reliable. Lots and lots of people are deterred from driving over the Pennines to Manchester because of the congestion, so when congestion is reduced they will be tempted back on to the roads and the congestion will eventually return. Induced Demand. 1 Sheffield Forum | The Sheffield Guide | The Sheffield Shop Link to comment Share on other sites More sharing options...
Delbow Posted September 4 Share Posted September 4 The highly controversial Newbury bypass did not deliver the expected benefits Link to comment Share on other sites More sharing options...
geared Posted September 4 Share Posted September 4 Having some friends living down there, they'd beg to differ. Newbury traffic was always horrendous before the bypass was built, and that was back in the 90's. I can't imagine what it'd be like with todays traffic levels. Link to comment Share on other sites More sharing options...
peak4 Posted September 4 Share Posted September 4 Clearly the topic/project has political as well as environmental for many years The previous MP, (and maybe others prior to that before we moved over here), seemed to be using it as a political football, perhaps being less than truthful in some of his accusations, and then claiming a personal victory when the court case was decided. https://www.buxtonadvertiser.co.uk/news/transport/high-peak-mp-and-campaigners-clash-over-glossop-bypass-3989997 (No account needed to view, just claim to register later.) The CPRE were one of the campaigners leading up to the recent court case(s) https://www.cprepdsy.org.uk/wp-content/uploads/sites/31/2021/08/A57-Link-Roads-Key-Points.pdf https://www.cprederbyshire.org.uk/news/stop-mottram-bypass-wrecking-the-climate-and-green-belt/ https://highpeaklabour.co.uk/labour-will-build-the-mottram-bypass/ It's very much a link road and not a large scale bypass, so may cause issues for residents in other villages, such as Tintwistle, if it leads to a long term increase in HGV traffic. Link to comment Share on other sites More sharing options...
HairFarceOne Posted September 4 Share Posted September 4 In practical terms, the only way to reduce congestion on both Woodhead and Snake is to put weight limits on them, thereby forcing HGV's on to the M62. I believe that this was one of the reasons for the M62; to allow HGV's to cross the pennines through all weathers. Of course, counter productively, it could lead to an increase in car and lighter transport using the routes. 1 Link to comment Share on other sites More sharing options...
Recommended Posts
Create an account or sign in to comment
You need to be a member in order to leave a comment
Create an account
Sign up for a new account in our community. It's easy!
Register a new accountSign in
Already have an account? Sign in here.
Sign In Now